Design a system that carries your critical loads through an outage, with the right transfer time and load-management strategy.
[To be confirmed by company] Narrative, sizing examples and ROI logic must be verified before publication. Do not promise savings figures.
How the system works
- Site assessment and load profile
- Capacity and inverter sizing
- Grid-connection and registration steps for the target market
- Commissioning, monitoring and after-sales
Indicative configuration
| Scenario | Indicative configuration | Notes |
|---|---|---|
| Whole-home essential loads | Home ESS 5-10 kWh | 【待企业确认】 |
| Larger home with pump or HVAC | Home ESS 10-20 kWh | 【待企业确认】 |
| Retail / small commercial | Home ESS + parallel units | 【待企业确认】 |
What we need from you
- Country / city and grid operator or municipality
- Average daily consumption (kWh) and peak load (kW)
- Existing PV capacity, if any
- Whether grid-connection approval is required