Grid Connection Standards

Grid-connection requirements decide whether a system can be commissioned at all. This page compares requirements by market; municipal rules may add further conditions.

[To be confirmed by company] Thresholds and test versions change with revisions. Confirm the valid certificate version with the certification body before quoting.

Comparison by market

MarketStandard / requirementApplies toTypical local addition
EU (general LV)EN 50549-1Generation equipmentNational implementation
EU (general MV)EN 50549-2Generation equipmentNational implementation
Germany / AustriaVDE-AR-N 4105 (LV), VDE-AR-N 4110 (MV)Inverter + storageUnit certificate (Einheitenzertifikat), grid-operator registration
GermanySec. 14a EnWG (controllable loads), Sec. 9 EEG (feed-in limitation)Systems 2-100 kWSmart feed-in limitation
ItalyCEI 0-21 (LV), CEI 0-16 (MV)InverterLocal distributor registration
United KingdomG98 / G99 + BS 7671 installationInverterDNO application
South AfricaNRS 097-2-1:2017 (approved inverter list), SANS 10142-1-2Inverter + embedded generationMunicipal SSEG registration (rules differ per municipality), CoC by a registered electrician
MalaysiaSIRIM + Energy Commission (Suruhanjaya Tenaga)Product + installationSolar ATAP application
VietnamEVN grid requirements; Decree 135 / Decree 243 frameworkRooftop PVProvincial rollout varies
IndonesiaSNI (scope to be confirmed) + PLN requirementsProductConfirm mandatory scope
PhilippinesERC net-metering rules, local electrical codeInverterNet-metering application on the user side
ThailandMEA / PEA approvalGrid-tiedLocal channel dependent

Disclaimer for installers and users

Grid connection must be carried out by a locally licensed electrician or registered installer. Requirements differ between grid operators and municipalities, and may change without notice. The information on this page is guidance only and does not replace the applicable local regulation.

Municipality-level guidance

Per-municipality guidance is published market by market. South Africa alone has 177 municipalities with their own SSEG rules – see the South Africa market page.